Residential property consisting of several plots of land (29 plots of land - land for construction and access roads). Most lots are built with P or P +1 constructions or only with foundations. The degree of completion of the constructions is between
The degree of completion of the constructions is between 20 and 80%. Electricity and other utilities are at the property's limit.
The residential property is only 10 km from the town of Craiova, in the northern area of Malu Mare village.
The vi
GEEA GOAT FARM
Goat and baby goat industrial farm, Satulung village, FN, Maramures County
Presentation of the asset
· The farm is located in Satulung village, FN, Maramures county
· The road access in the area is easy and is done directly from the
RINA TIROL 3-STAR RESTAURANT HOTEL,
Poiana Brasov, Brasov County
Location
· Rina Tirol is a 3-star hotel with 56 rooms located in Poiana Brasov, Brasov County
· The property consists of land and building, hotel, located on Poiana lui Stechil Stre